Installation of Aestuver® tunnel fire protection systems

Correct installation is what turns Aestuver® fire protection boards into an effective tunnel fire protection system. This guide covers the key steps – from storage, handling and cutting to fixing, joints, surface treatment and repairs – based on the Aestuver® installation instructions.

The importance of fire protection systems for tunnels

Tunnels are unique structures that require specialised fire protection systems to prevent potential fire hazards. These systems are designed to prevent concrete spalling, stop fires from spreading, protect the structural integrity of the tunnel and keep tunnel users and emergency services safe.

Proper installation is crucial to achieving these objectives. Fire protection systems in tunnels are essential, as they help to contain and control fires, minimise damage to the tunnel structure and provide safe evacuation routes for people.

Furthermore, they protect critical infrastructure and reduce the risk of catastrophic failures that could lead to significant economic losses and loss of life.

Why tunnel fire protection matters

Planning and preparation

What are Aestuver® tunnel fire protection systems?

Aestuver® tunnel fire protection systems are passive fire protection systems. They consist of certified, fire-tested components such as Aestuver® fire protection board Tx, backing strips, fixings, Aestuver™ FPM Mastic and a supporting structure.

Before you start: standards and regulations

Before starting the installation, ensure that you comply with local standards, safety regulations and building regulations. Compliance with these guidelines is mandatory in order to prevent substandard installations and potential safety risks. Compliance with the standards ensures that the fire protection system will function as intended in the event of a fire. It also helps to avoid legal liability and ensures that the installation meets the requirements of insurance companies and regulatory authorities. Installers should familiarise themselves with the relevant standards, project specifications and local building regulations.
 

Personal Protective Equipment (PPE) 

Safety is the top priority during the installation process. All personnel involved must wear the personal protective equipment (PPE) required by health and safety regulations, such as safety goggles, gloves, helmets and other necessary protective equipment. PPE protects workers from potential hazards such as falling objects and sharp edges.

It is important to ensure that all PPE complies with national standards and is suitable for the specific tasks involved. Regular training and safety briefings should be carried out to ensure that all staff are aware of the correct use and maintenance of PPE.

Storage on site

Aestuver® fire protection boards – including boards T and Tx – are delivered flat on pallets and must always be stored flat on a level surface; vertical storage can deform the boards and damage the edges. When boards are stacked, the floor must have adequate load capacity.

Because they are frost- and water-resistant, the boards can be stored outdoors. Protect them from excessive moisture before installation to ensure problem-free fitting and a clean surface finish, and keep the storage area free of debris that could damage them.

Handling on site

Transport Aestuver® fire protection boards horizontally by forklift or other board transport vehicles. Always carry single boards upright.

Choose tools and working methods that protect the edges – board lifters or carrying aids make manual handling easier. Transport and lifting equipment must prevent damage from bending, vibration or collision. Where such tools are not available, workers should wear gloves.

How do you cut Aestuver® fire protection boards?

Aestuver® fire protection boards can be cut with a rail-guided circular hand saw with dust extraction (preferably a plunge saw) or with a stationary panel saw. For precise, clean edges, use carbide-tipped saw blades with alternating teeth; blades with fewer teeth and low rotation speeds reduce dust.

Rounding and other adjustments can be made with a jigsaw, router or hole saw. As usual when cutting board materials, use extraction units with a run-on function – ideally at a dedicated sawing station.

Specialist tools and equipment

Standard tools

  • Hand saw: For cutting the boards to size.

  • Spirit level: Ensures the boards are installed level and plumb.

  • Club hammer: For driving in nail anchors and other fasteners.

  • Soft-faced mallet: Prevents damage to the board surface when driving in fasteners.

  • Tape measures: Essential for accurate measurements.

  • Electric screwdriver: Speeds up the installation process.

  • Hammer drill: For drilling holes in concrete and other hard surfaces.

  • Angle grinders: For cutting and shaping the boards.

  • Cordless screwdriver: Offers mobility and comfort.

  • Chalk line: For marking straight lines.

  • Rope: To secure the boards during transport.

 

Specialist tools

  • Plunge saw with guide rail and dust extractor: Ensures precise cuts and minimises dust.

  • Stapler: For fixing backing strips to the fire protection boards with standard steel staples.

Additional equipment

Depending on the conditions on site, additional equipment such as scissor lifts, platforms and vacuum lifters may be required. These tools and pieces of equipment help to ensure a safe and efficient installation process. Scissor lifts and work platforms provide access to high areas, whilst vacuum lifters make it easier to handle large boards.

Installation of Aestuver® tunnel fire protection systems


Surface preparation
The surface for the fire protection boards should be level, flat and dry. Any protruding objects, such as screws and nails, must be removed. Backing strips – thin strips of Aestuver® fire protection board – are part of the Aestuver® tunnel fire protection system and help fitters to level out uneven substrates. They can be fixed to the boards with standard steel staples, so individual cladding elements can be prefabricated.

Proper surface preparation is crucial to ensuring a secure and stable installation. The surface should be checked for cracks, leaks and other imperfections that could compromise the performance of the tunnel fire protection system.

Anchors

Nail anchors or concrete screws are typically used to fix Aestuver® fire protection boards directly in tunnels. The type, size and spacing of fasteners vary by project and must always be approved by the Aestuver® Application Technology team.

Always use the correct anchor type and size and follow the anchor manufacturer's installation instructions, so the boards are securely fixed to the tunnel structure and can withstand the loads acting on them.

Find out more about installation methods in our Tunnel brochure.

Expansion Joints

Aestuver® fire protection boards are butt-jointed with a gap of ≤ 2 mm. Where necessary, wider gaps can be filled with Aestuver™ assembling mortar or a similar material – always with approval from the Aestuver® Application Technology team.

Correct joint design ensures a continuous, effective fire barrier: butt joints must be tight, with no gaps through which fire and smoke could penetrate.

More on expansion joints

Surface treatment

The smooth surface of Aestuver® fire protection boards makes them ideal for painting or coating. No filling is needed before the final finish, but a base primer is recommended if the surface is to be painted or varnished. Dispersion-, resin- or acrylic-based fillers, paints and varnishes from standard commercial manufacturers can be used; for special applications, the surface may need to be impregnated with alkali-resistant products.

Boards must be dry and free of dust and grease before treatment. Coatings up to 0.5 mm thick do not affect the fire resistance classification. In road tunnels, Aestuver® fire protection boards must be surface-coated for frost and road-salt resistance – the solution is agreed for each project with the Aestuver® Application Technology team.

Quality control and repairs

Aestuver® fire protection boards are CE-marked, with their properties set out in the relevant European Technical Assessments (ETA). Regular inspections help to detect any defects or damage that could affect system performance.

Minor damage from installation (width/depth ≤ 5 mm) is repaired with Aestuver™ repair mortar or Aestuver™ fire protection compound (fire protection board and board T), or with Aestuver™ repair mortar or Aestuver™ FPM Mastic (board Tx). Damage to edges and surfaces up to 2 mm needs no repair. Unused drill holes (6–20 mm diameter) are filled with Aestuver™ fire protection mastic; new fasteners must be set at least 15 mm away.

Conclusion

The installation of fire protection systems for tunnels is a meticulous process that requires compliance with standards, correct handling and the use of specific tools.

By following the guidelines set out in this article, you can ensure a safe and effective installation that enhances the safety and integrity of tunnel structures.

The correct installation of fire protection systems is crucial for protecting tunnels from fire hazards and ensuring the safety of occupants and emergency services personnel. It also helps to maintain the structural integrity of the tunnel and minimise damage in the event of a fire.
 

For further details, please refer to our Installation leaflet and, if necessary, consult our fire safety experts. Ensure that your fire safety systems are installed to the highest standards.