Efficient processes from start to finish
Aestuver® FireShield is designed throughout for an efficient construction process and keeps construction running smoothly in every project phase. From integration into the shell, through building services installation, to the final fire stop, every work stage is optimally coordinated. This ensures clear processes, reduces coordination effort and minimises interfaces between the trades involved.
Installation
The contractor integrates Aestuver® FireShield directly into the building structure as early as the shell construction phase – cast into concrete in concrete slabs and screwed in place in timber floors. The system becomes an integral part of the building at an early stage, providing a safe, robust basis for the subsequent fit-out and installation work.
Aestuver® FireShield can be walked on immediately after installation. Building work proceeds smoothly, the areas can be used without restriction and following trades find ideal conditions.
Creating openings
Aestuver® FireShield makes building services installation efficient and practical. The openings required can be made flexibly on site, as needed, using conventional drilling and sawing tools.
Complex, costly procedures such as core drilling are no longer necessary.
Installing services
Services are routed through the shafts in a clearly structured, easily accessible system. Aestuver® FireShield allows clear, flexible cable and pipe routing, so all trades can carry out their installations efficiently, in coordination and without getting in each other’s way.
Fire stopping
The final sealing and fire stop are installed in accordance with the system by trained Aestuver® partner companies. Aestuver® FireShield allows this work to be carried out efficiently from above – complex access routes or scaffolding underneath are generally not required.
Aestuver® FireShield in practice
The video demonstrates each application step for Aestuver® FireShield throughout the construction process – step by step, clearly explained and easy to follow.
Frequently asked questions about Aestuver® FireShield
Answers to the most important questions about planning, applying and using Aestuver® FireShield.
The Aestuver® FireShield elements are installed under the responsibility of the site foreman. As the foreman is in direct contact with the Aestuver® FireShield partner company, delivery dates and batch sizes are agreed jointly. The foreman then receives a numbered opening plan from the partner company, which clearly shows every element and its position.
Aestuver® FireShield elements are manufactured at our factory in Calbe (Saale), Germany, in accordance with the requirements of the aBG. The fire protection boards used for them are also produced there.
In principle, the site management decides when the openings in Aestuver® FireShield are made. However, the Aestuver® FireShield team recommends that the Aestuver® FireShield partner company only cuts the openings once the floor above has been concreted with its Aestuver® FireShield elements. This keeps the building watertight and allows building services installation to start promptly.
Both the openings in Aestuver® FireShield and the fire stops for these openings are made by a trained specialist company – giving you a clean, complete solution from a single source. As safety is our top priority, our partner companies attend refresher training every year so that they are always aware of the specific risks of working in riser zones.
The elements are usually configured and manufactured according to the project’s opening plan. In addition to project-specific prefabrication, the following standard sizes are available: 625 × 625 mm, 1,250 × 625 mm and 1,250 × 2,600 mm. On request, we are also happy to develop a standard size with you for your typical construction method.