A clearly structured construction process, stage by stage
Aestuver® FireShield supports an efficient construction process from the early planning stage. Technical advice, project-specific configuration, precision manufacturing, just-in-time delivery and the creation of service openings by certified partner companies all work together seamlessly. This reduces interfaces, simplifies processes and creates ideal conditions for installing building services – and for the final, system-compliant fire stop carried out by authorised partner companies.
Six steps to the finished fire stop
The foundations for using Aestuver® FireShield successfully are laid in the early planning phase. Our sales team provides technical advice, clarifies project-specific requirements and works with you to develop the best solution.
On request, we integrate the Aestuver® FireShield elements into your BIM model and prepare the specifications – reducing coordination effort, simplifying processes and speeding up project delivery.
Based on the agreed plans, the required Aestuver® FireShield elements are configured for the project and ordered through an authorised Aestuver® FireShield partner company. They are then manufactured at our factory in Calbe, strictly to the customer’s specifications – so they fit perfectly into the construction project.
Aestuver® FireShield elements are delivered just in time, either directly to the construction site or to the precast plant. This supports an efficient construction process, reduces downtime and allows immediate integration into the ceiling structure. Once installed, the shaft areas can be walked on immediately and are reliably protected from the weather.
The openings for building services are created on site by a certified Aestuver® FireShield partner company. They can be made quickly, flexibly and precisely using standard drilling and sawing tools – no complex special procedures or equipment are needed.
Services are routed efficiently through the prepared openings. The slim profile of Aestuver® FireShield makes it particularly easy to insert and align longer pipe sections. This simplifies installation considerably and offers clear advantages over conventional core drilling in handling and execution.
The final fire stop is installed professionally by an authorised Aestuver® FireShield partner company, using Aestuver® system components installed in accordance with the relevant approvals. This ensures that all penetrations are sealed safely and in compliance with standards, with clear responsibilities and minimal coordination effort.
Aestuver® FireShield in the construction process
Aestuver® FireShield supports an efficient construction process from the early planning stage. Technical consultancy, project-specific configuration, bespoke manufacturing, just-in-time delivery and the creation of service openings by certified partner companies all work together seamlessly. This reduces interfaces, simplifies processes and creates ideal conditions for installing building services – and for the final, system-compliant fire stop carried out by authorised partner companies.
Aestuver® FireShield installation process
The video demonstrates each stage of the Aestuver® FireShield installation process step by step – clearly and easy to follow.
Frequently asked questions about Aestuver® FireShield
Answers to the most important questions about planning, applying and using Aestuver® FireShield.
In principle, the site management decides when the openings in Aestuver® FireShield are made. However, the Aestuver® FireShield team recommends that the Aestuver® FireShield partner company only cuts the openings once the floor above has been concreted with its Aestuver® FireShield elements. This keeps the building watertight and allows building services installation to start promptly.
Both the openings in Aestuver® FireShield and the fire stops for these openings are made by a trained specialist company – giving you a clean, complete solution from a single source. As safety is our top priority, our partner companies attend refresher training every year so that they are always aware of the specific risks of working in riser zones.
The elements are usually configured and manufactured according to the project’s opening plan. In addition to project-specific prefabrication, the following standard sizes are available: 625 × 625 mm, 1,250 × 625 mm and 1,250 × 2,600 mm. On request, we are also happy to develop a standard size with you for your typical construction method.
Aestuver® FireShield elements are manufactured at our factory in Calbe (Saale), Germany, in accordance with the requirements of the aBG. The fire protection boards used for them are also produced there.
The Aestuver® FireShield elements are installed under the responsibility of the site foreman. As the foreman is in direct contact with the Aestuver® FireShield partner company, delivery dates and batch sizes are agreed jointly. The foreman then receives a numbered opening plan from the partner company, which clearly shows every element and its position.
Find out more about Aestuver® FireShield
A clearly structured overview of Aestuver® FireShield as a complete system – with detailed information on planning, application and installation throughout the construction process.