Structural fire protection references

Aestuver® fire protection solutions – proven in challenging construction projects

Vocational College for Colour and Design, Munich

A safe new school building in Munich with Aestuver®

For the new vocational college for colour and design in Munich, the city is applying the highest fire safety standards. Around 13,000 m² of Aestuver® fire protection boards reliably protect the steel beams across five storeys to fire resistance class F 90-A – even under demanding conditions such as those in the plant room. The cement-bonded, glass fibre-reinforced lightweight concrete boards, classified as non-combustible (A1), were installed on three sides in thicknesses from 20 to 30 mm, matched to the respective Ap/V values.

Complex bespoke details such as penetrations, trapezoidal steel sheet connections and sliding ceiling connections were also individually designed and implemented – a prime example of bespoke structural fire protection.


Download reference
A safe new school building in Munich with Aestuver®

Stadthalle Magdeburg

Aestuver® cable ducts ensure safety in the event of fire

The Stadthalle Magdeburg is a major cultural landmark. Severely damaged in the Second World War, it was rebuilt in the 1950s and 1960s. Since 2021, it has been undergoing extensive refurbishment to optimise its use.

State-of-the-art stage, lighting and IT equipment requires comprehensive fire protection to protect people and property in the event of fire. The choice fell on weather-resistant Aestuver® fire-resistant cable ducts, which are suitable for almost any application thanks to their material composition.


Advantages

  • In addition to the outstanding fire resistance and material properties of the cable ducts, the flexibility of the components – which allowed a wide range of bespoke solutions to be implemented quickly and easily – was a decisive factor.

  • The board’s special composition contains no combustible components, so no toxic gases or smoke that impairs visibility are released in the event of fire.

  • The cable ducts withstood moisture during the installation phase without any damage.

Download reference

One Plaza, Düsseldorf

A new seven-storey office and retail building has been built in Düsseldorf. A particular challenge was the fire protection cladding with fire resistance class F 90-A for the steel columns in the building. Fire protection cladding for steel tension rods is not covered by the standard test certificates available on the market, so Aestuver® worked with the client to develop a bespoke solution, which then formed the basis of the tender.


Download reference

Stadtloggia, Heidelberg

The Stadtloggia on Europaplatz in Heidelberg links the Bahnstadt district with the city centre and the main railway station. It offers a barrier-free route and weather-protected outdoor dining.

A key challenge at the planning stage was the cladding of the steel beams in the Stadtloggia ceiling, which had to meet fire resistance class F 90-A and also be suitable for outdoor use. Calcium silicate boards were originally planned, but the construction with weather-resistant Aestuver® fire protection boards offered these advantages:

  • Time and cost efficiency thanks to straightforward processing

  • Integration of lighting elements

  • Robustness: heat-, frost- and water-resistant

  • Excellent fire resistance of up to 360 minutes

Download reference

Schwerin Castle

The Schlossgarten wing of Schwerin Castle was refurbished over a five-year construction period. At the heart of the project was a new plenary hall with conference and ancillary rooms for the State Parliament of Mecklenburg-Western Pomerania, which sits in the castle. To meet the specific fire protection challenges together with the climatic requirements, bespoke solutions were developed with Aestuver® fire protection boards.

Aestuver® fire protection boards enabled the building to achieve the required fire resistance class F 90-A for the ceilings in the office area and F 30-A for the floors in the technical centre.

Thanks to their resistance to weather, frost and water, the special fire protection boards also withstood the challenging climatic conditions in the plant room.

Aestuver® fire protection boards for the refurbishment of Schwerin Castle

Munich Airport Terminal 2

A second passenger route with additional aircraft boarding points was built on top of the existing Terminal 2 at Munich’s Franz Josef Strauss Airport – a lightweight walkway approximately 8 metres wide and around 1,000 metres long.

With two layers of 25 mm Aestuver® fire protection boards, the partition and shaft walls met the F 90-A requirement in accordance with AbP P-SAC 02 III-213. With a very low weight of just 18 kg/m² per side, the structural requirements were easily met. Precise logistics were equally important, as most materials were delivered across the apron with an escort vehicle.

In total, approximately 8,000 m² of Aestuver® fire protection boards were installed. Metal panels were chosen as the visible surfaces inside and outside.

Aestuver® fire protection boards for Terminal 2 at Munich Airport

Neues Museum, Berlin

The rebuilt Neues Museum in Berlin attracts international attention with its unique combination of modern interior design and historic architecture, with war damage deliberately left visible.

The client required a climate- and energy-optimised ventilation system. As well as ensuring a balanced indoor climate, it had to protect the artworks permanently from damage caused by excess humidity. A water- and frost-resistant, non-combustible (A1) material was therefore required for the ventilation ducts.

With their high weather resistance, Aestuver® fire protection boards were ideally suited to these requirements.

In total, around 3,300 m² of lightweight fibre-reinforced concrete boards were processed into prefabricated ventilation ducts with a maximum internal cross-section of 1,200 × 1,200 mm.

Aestuver® fire protection boards at the rebuilt Neues Museum, Berlin

Berlin Central Station (Lehrter Bahnhof)

At Berlin Central Station, Europe’s largest transport hub, the extensive technical installations are safely enclosed in fire-resistant cable ducts.

This large-scale project required a wide range of bespoke solutions, which could be implemented quickly and flexibly with Aestuver® cable ducts. Installation time was reduced significantly, as the ducts were delivered to site just in time, ready to install.

Aestuver® cable ducts at Berlin Central Station